Compare the full decision, not only the floor plan.

For an existing home, review condition, inspection results, permitted alterations, immediate repairs and likely operating costs. For a build, include land, design and engineering, surveys, geotechnical work, site preparation, utility extensions, permitting, builder scope, allowances, contingency, temporary housing and construction financing. Request comparable written scopes and ask professionals to identify exclusions.

Find out which government controls the parcel.

Before buying land or assuming an existing improvement can be repeated, confirm the city limits, extraterritorial jurisdiction, county and any special district. Austin Development Services provides a residential permit guide and plan review process for applicable City work. Travis County states that new single-family homes in unincorporated county areas require county permits. Rules can vary by jurisdiction and project; contact the authority with the legal description and proposed scope.

Investigate the site before committing to a design.

Commission the appropriate survey and professional reviews for slope, drainage, floodplain, soils, trees, access, easements, retaining walls and utility availability. City and county codes can restrict work on steep slopes, flood-prone land or other sensitive areas. A listing statement such as “buildable” is not a permit, engineering opinion or guarantee that a preferred design can be approved.

Check water, wastewater and access early.

Request written service availability from utilities and identify whether the property uses a septic system, well, private road or shared access. Travis County’s OSSF process calls for parcel, site-plan, slope, easement and floodplain information. Confirm current application requirements directly; an expired or preliminary application is not approval to construct.

Set a decision checkpoint before the offer or deposit.

Ask the local planning authority, surveyor, engineer, architect, builder and lender which investigations must be completed before a purchase or design commitment. Put key approvals, contingency assumptions and exit dates in writing with your real estate and legal professionals. This guide does not promise approval, cost, resale value or construction timing.